I finished the Christmas stocking I was working on. We took a week long vacation to San Diego, which gave me plenty of time to knit - we planned our vacation to have a lot of down time this year, not so go go go, which I think was great for everyone. By the time we pulled back in our driveway I only had to Kitchener the toe (I'm prone to car sickness so I couldn't look at my hands long enough while riding to finish it).
I absolutely love the way it turned out! But I wanted to try lining it so that nothing would catch on the floats if I stuffed it. While I am not an experienced sewer, lining this ended up being super easy.
I found an awesome snowflake fabric at Joann to coordinate with the knitted snowflake motif. Then I laid out my stocking on the fabric, tracing it and adding a half inch seam allowance. I cut it slightly shorter than the stocking (up to the red ridge).
I cut the first piece out, then used it to trace the second piece (turning it so I wouldn't have two front side pieces and no backside pieces.
No comments:
Post a Comment